ASPHALT RECLAMATION
For chip-sealed and low-volume asphalt roads, parking lots, and state highways
that have become deteriorated, Pozzolanic has specialized equipment to finely
grind these road materials and mix them in-place with the existing stone base
to form an excellent road base with increased strength and durability.
This
in-place asphalt reclamation process is less costly than traditional repair
alternatives, and the end result is an improved road base that requires less
maintenance.
If the road or parking lot is experiencing valleys and dips, potholes, and
other pavement failures caused by poor soils or wet soils underneath,
Pozzolanic can mix in a stabilizing agent; such as, lime or cement, to modify
the subgrade at the same time road materials are being ground into the existing
base materials. Subgrade modification significantly improves pavement life

Users of this in-place asphalt reclamation process have reported reduced
maintenance costs of more than 50%.
Once the reclamation process is complete, only a thin asphalt overlay or
chip-seal surfacing is required.
The process is fast and efficient so that there is minimal interruption in the
use of the road or parking lot.
![]()
Pozzolanic Contracting & Supply Co., Inc.
2531 Asbury Road
Knoxville, TN 37914-6410
Phone 865-546-7676
[ Home ] [ Material Supplier ] [ Soil
Stabilization ] [ Soil Modification ]
[ Asphalt Reclamation ] [ Contact
Us ]
Copyright
www.pozz.comİ - All rights reserved
Pozzolanic Contracting & Supply Co., Inc.